Question:
Import of industrial boiler items on installation and commissioning. In addition to being registered for state quality control, this item is also subject to the minimum energy efficiency regulations under Decision 24/2018 / TTg effective July 10, 2018. Under this decision we have to do a minimum energy efficiency test as directed by the Ministry of Industry and Trade and submit the post-clearance documents. However, if we enter the boiler for the first time and have tested the energy efficiency, then the second time when we import the same model, does the energy efficiency for this next boiler have to be done?

Reply:

- Pursuant to Clause 4, Article 4 of Circular No. 36/2016 / TT-BCT dated December 28, 2016 of the Ministry of Industry and Trade stipulating energy labeling for means and equipment using energy:

"Article 4. Energy efficiency test

... 4. Typical sample testing: Enterprises take samples by themselves, equipment, quantity and methods of taking samples according to corresponding standards or regulations of the Ministry of Industry and Trade and send them to testing organizations for testing and issue test results.

5. Test results are the basis for energy labeling of products of the same model, same specifications, same origin and same manufacturing facility. Test results are valid indefinitely, unless competent state agencies detect violations in testing results or have violations or violations committed by testing organizations ”.

Request the company to refer to the above-mentioned contents to implement, in case of arising problems, please contact the Customs Department where the intended registration of a declaration or a specialized agency of the Ministry of Industry and Trade is proposed to obtain specific instructions.
Bài viết khác
Import of industrial boiler items 8402 26/06/2020 13:34 Import of industrial boiler items on installation and commissioning. In addition to being registered for state quality control, this item is also subject to the minimum energy efficiency regulations under Decision 24/2018 / TTg effective July 10, 2018. Under this decision we have to do a minimum energy efficiency test as directed by the Ministry of Industry and Trade and submit the post-clearance documents. However, if we enter the boiler for the first time and have tested the energy efficiency, then the second time when we import the same model, does the energy efficiency for this next boiler have to be done? Chi tiết
Nhập khẩu Nicotin để sản xuất thực phẩm chức năng (Thuốc cai nghiện thuốc lá) 27/05/2020 09:30 Công ty đã có số Công bố Thực phẩm chức năng cho sản phẩm cai nghiện. Như vậy, nhập nguyên liệu Nicotin có cần phải xin giấy phép nhập khẩu không và xin ở Cục An toàn thực phẩm hay Cục Quản lý Dược và theo thông tư nào. Chi tiết
Tôi có 1 vướng mắc về hàng an ninh quốc phòng mà dính thuế nhập khẩu...? 08/07/2019 13:27 Tôi có 1 vướng mắc về hàng an ninh quốc phòng mà dính thuế nhập khẩu, tờ khai đã thông quan, thuế nhập khẩu thì khai mã C, không nộp ngay, bây giờ phải làm hồ sơ xin miễn thuế lên Tổng cục hay thế nào ạ? Chi tiết
In which case must we check the customs value of exported goods? 04/07/2019 16:24 Facing the situation of some enterprises declaring incorrectly the value of export goods as incomplete declaration of the factors constituting the selling price at the export border gate; low declaration of selling prices at export border gates, not in line with relevant records and vouchers for the purpose of tax evasion, export tax frauds ..., the General Department of Customs has instructed units to uniformly inspect Customs value of export goods with each specific case to tighten the management of customs value for these goods.​ Chi tiết
Phòng 01, Tầng trệt, Tòa Nhà Flora, Số 59 Đường 19, Khu Phố 19, Phường An Khánh, TP. HCM
 
 0988 6666 87        
 info@logisticsh-a.com                        Hotline: 
 
      
(028) 22335566
 
Hotline
Quý khách có nhu cầu vui lòng liên hệ
0988 6666 87