Question:
Import of industrial boiler items on installation and commissioning. In addition to being registered for state quality control, this item is also subject to the minimum energy efficiency regulations under Decision 24/2018 / TTg effective July 10, 2018. Under this decision we have to do a minimum energy efficiency test as directed by the Ministry of Industry and Trade and submit the post-clearance documents. However, if we enter the boiler for the first time and have tested the energy efficiency, then the second time when we import the same model, does the energy efficiency for this next boiler have to be done?

Reply:

- Pursuant to Clause 4, Article 4 of Circular No. 36/2016 / TT-BCT dated December 28, 2016 of the Ministry of Industry and Trade stipulating energy labeling for means and equipment using energy:

"Article 4. Energy efficiency test

... 4. Typical sample testing: Enterprises take samples by themselves, equipment, quantity and methods of taking samples according to corresponding standards or regulations of the Ministry of Industry and Trade and send them to testing organizations for testing and issue test results.

5. Test results are the basis for energy labeling of products of the same model, same specifications, same origin and same manufacturing facility. Test results are valid indefinitely, unless competent state agencies detect violations in testing results or have violations or violations committed by testing organizations ”.

Request the company to refer to the above-mentioned contents to implement, in case of arising problems, please contact the Customs Department where the intended registration of a declaration or a specialized agency of the Ministry of Industry and Trade is proposed to obtain specific instructions.
Bài viết khác
​The company has 1 shipment 12 cont , has been liquidated and shipping company has 12 cont. However...? 05/07/2019 10:11 The company has 1 shipment 12 cont , has been liquidated and shipping company has 12 cont. However, when the container is dropped on the ship, the shipping company detects that the cont is broken and silicon is injected. (When we receive the cont, we have discovered and requested the repair and injection port of silicon, the inspection is satisfactory, so we close it. ), the shipping company reports consignee and that party does not agree to load this cont. Now the carrier has loaded 11 containers on board, leaving 1 cont. Is it possible to correct the clearance and reduce the amount of dragging to 1 cont? Or must I leave 12 unloaded cont? Chi tiết
How is rice export contract done? 16/05/2019 15:52

How is rice export contract done?

 
Chi tiết
How about export of colored sand? 16/05/2019 15:50

How about export of colored sand?

 
Chi tiết
In which case does the customs office inspect processing facilities, manufacturing, processing capacity, production? How long is the processing time for processing, manufacturing, machining capacity, production? 16/05/2019 13:49

In which case does the customs office inspect processing facilities, manufacturing, processing capacity, production? How long is the processing time for processing, manufacturing, machining capacity, production?

 
Chi tiết
Phòng 01, Tầng trệt, Tòa Nhà Flora, Số 59 Đường 19, Khu Phố 19, Phường An Khánh, TP. HCM
 
 0988 6666 87        
 info@logisticsh-a.com                        Hotline: 
 
      
(028) 22335566
 
Hotline
Quý khách có nhu cầu vui lòng liên hệ
0988 6666 87